Project Description

The 6-Mile Creek Trail will connect the Rivergreenway at Tillman Park with the Rivergreenway at Maplecrest Road, providing a significant loop in the trail network. The trail has been completed from Tillman Park to Fellowship Missionary Church at the intersection of Tillman Road and Lemar Drive. The next phase from the church to Crown Colony is underway with survey work.

Project Location

6-Mile Creek Trail

Trail Rules

  • No Motor Vehicles

    Trails are designed only for people-powered vehicles.

  • Leash your Pets

    Pets are welcome, but must be leashed. Remove and dispose of any waste.

  • Be Kind

    Be respectful of others. Always yield to slower trail users.

  • Safety First

    Obey all traffic signs and signals.

Mid-Block Crossings

As of February 2025, the Fort Wayne Area Trails Network consists of 153 miles of trails, with 107 miles inside City limits. Most of the trails in City limits are planned, designed, constructed, and maintained by the City of Fort Wayne under the leadership of Mayor Sharon Tucker.