Project Description

Resetting Growth Avenue brick street from Main Street to Morrison Street. This project will also include new sidewalk and curb replacement, subsurface drainage installation, and restoration of disturbed areas.

Before Construction

  • Possible restricted access on both Morrison Ave. and Growth Ave. while construction is in progress.
  • Drive approaches may be inaccessible on the side of the street that is being worked on. Depending on the weather, this can range from 3 weeks or more.
  • Drive slowly and cautiously through the job site, especially when the contractor is on site working.
  • It will be loud, dirty and dusty.
  • Do not move barricades, the contractor will move them and open the road to traffic when it is acceptable to be driven on.
  • The contractor will not water the grass seed. It will be the property owner’s responsibility to water the grass seed to ensure proper and adequate growth.
  • On trash day, place trash & recycle bins on the side of the street that is not being worked on.
  • PAY ATTENTION

    AVOID DISTRACTIONS!

    Be aware of all signage and reduced speeds. Avoid distractions such as cell phones, eating/drinking, and radio.

  • BARRICADES

    DO NOT MOVE BARRICADES!

    The contractor will move them once pavement passes testing and can withstand vehicle weights.

  • WORKER SAFETY

    BE PREPARED TO STOP!

    Slow down and give workers extra room. Drive cautiously through the jobsite especially If workers are on site.