Project Description

This project will mill and resurface Hillegas Road as well as add travel lanes on Hillegas Rd between West State Blvd. and West Coliseum Blvd. Features include a center turn lane, sidewalks, a multi-use path, urban street design with curb and gutter, storm sewers, pedestrian facilities, street lighting and urban landscaping. The project will be constructed in two phases. Phase 1 will involve Hillegas Road between Butler Road and Coliseum Blvd. Phase 2 will involve Hillegas Road between W State Blvd and Butler Road.

  • ADA curb ramps
  • Decorative lighting
  • Stormwater drainage improvements
  • Traffic signal upgrades
  • Enhanced safety features
  • Improved traffic flow
  • Intersection improvements
  • Temporary lane closures
  • Construction will occur in two phases to minimize traffic disruptions

Construction Limits

Phase 1 - Butler Road to Coliseum Blvd

Phase 2 - W State Blvd to Butler Road

  • PAY ATTENTION

    AVOID DISTRACTIONS!

    Be aware of all signage and reduced speeds. Avoid distractions such as cell phones, eating/drinking, and radio.

  • BARRICADES

    DO NOT MOVE BARRICADES!

    The contractor will move them once pavement passes testing and can withstand vehicle weights.

  • WORKER SAFETY

    BE PREPARED TO STOP!

    Slow down and give workers extra room. Drive cautiously through the jobsite especially If workers are on site.