Project Description

Improve the Imperial Swathmore Civic Neighborhood Association by replacing the deteriorated concrete street, replacing some storm infrastructure, and adding underdrain when possible.

Before Construction

  • Removing and replacing the deteriorated concrete street
  • Adding new subsurface drainage as needed
  • Updating sidewalks to ADA compliant
  • Adding new drainage structures and new inlet castings
  • There will be multiple phases of lane closures, but always access eastbound and westbound.
  • Drive slowly and cautiously through the job site, especially when the contractor is on site working.
  • It will be dirty and dusty.
  • Do not move barricades, the contractor will move them and open the road to traffic when it is acceptable to be driven on.
  • The contractor will not water the grass seed. It will be the property owner’s responsibility to water the grass seed to ensure proper and adequate growth.

  • PAY ATTENTION

    AVOID DISTRACTIONS!

    Be aware of all signage and reduced speeds. Avoid distractions such as cell phones, eating/drinking, and radio.

  • BARRICADES

    DO NOT MOVE BARRICADES!

    The contractor will move them once pavement passes testing and can withstand vehicle weights.

  • WORKER SAFETY

    BE PREPARED TO STOP!

    Slow down and give workers extra room. Drive cautiously through the jobsite especially If workers are on site.