Project Description

The existing Lake Avenue Trail runs from Randallia Drive to Coliseum Boulevard on the north side of Lake Avenue. On the west end, the trail connects to the Randallia Drive Trail and Mark Slen Trail on Parkview’s campus and the trail connects to the Pemberton Levee Trail and Rivergreenway – Maumee Pathway.

This 0.45 mile extension from Coliseum Boulevard to Reed Road along the north side of Lake Avenue is expected to be constructed in 2027 or 2028. The topographic survey was completed in 2024. The route survey was just completed. Engineering is at 75% plans. Land Acquisition will occur in summer of 2026. Bidding of the project will occur in the spring of 2027 or late 2027.

This trail will connect to the existing sidewalk on Reed Road. Four apartment complexes and Concordia Lutheran School will be connected to the trail system with this extension.

Pre-Construction Photos

Trail Rules

  • No Motor Vehicles

    Trails are designed only for people-powered vehicles.

  • Leash your Pets

    Pets are welcome, but must be leashed. Remove and dispose of any waste.

  • Be Kind

    Be respectful of others. Always yield to slower trail users.

  • Safety First

    Obey all traffic signs and signals.

Mid-Block Crossings

As of December 2025, the Greater Fort Wayne Area Trails Network consists of 162 miles of trails, with 110 miles inside City limits. Most of the trails in City limits are planned, designed, constructed, and maintained by the City of Fort Wayne under the leadership of Mayor Sharon Tucker.