Project Description

The Lower Huntington Road bridge project consists of rehabilitation of the bridge deck, including replacement of the existing overlay, patching & widening of the sidewalk, riprap for scour protection, new decorative lighting, and revised pavement markings for safer travels. The project is expected to extend the bridge life another 30 plus years. R.L. McCoy is the contractor for this project.

Before Construction


  • PAY ATTENTION

    AVOID DISTRACTIONS!

    Be aware of all signage and reduced speeds. Avoid distractions such as cell phones, eating/drinking, and radio.

  • BARRICADES

    DO NOT MOVE BARRICADES!

    The contractor will move them once pavement passes testing and can withstand vehicle weights.

  • WORKER SAFETY

    BE PREPARED TO STOP!

    Slow down and give workers extra room. Drive cautiously through the jobsite especially If workers are on site.