Project Description

This project will consist of constructing new concrete sidewalks along both sides of North Clinton Street from S.R. 930 (Coliseum Blvd) to St. Joe Center Road. The sidewalks will vary from 5' to 7.5' wide.

Before Constriction

Looking North on N. Clinton St. | Looking South on N. Clinton St.
  • New sidewalk connections
  • Storm drainage improvements
  • Signal modernization
  • Pedestrian push buttons
  • ADA curb ramps
  • Bus pads
  • Concrete retaining curbs
  • Block walls
  • Ornamental fencing
  • Riprap
  • Restoration of site
  • There will be multiple phases of lane closures, with Clinton being down to one lane at times during construction.
  • Drive slowly and cautiously through the job site, especially when the contractor is on site working.
  • It will be dirty, muddy and dusty.
  • Do not move barricades, the contractor will move them and open the road to traffic when it is safe to do so.
  • PAY ATTENTION

    AVOID DISTRACTIONS!

    Be aware of all signage and reduced speeds. Avoid distractions such as cell phones, eating/drinking, and radio.

  • BARRICADES

    DO NOT MOVE BARRICADES!

    The contractor will move them once pavement passes testing and can withstand vehicle weights.

  • WORKER SAFETY

    BE PREPARED TO STOP!

    Slow down and give workers extra room. Drive cautiously through the jobsite especially If workers are on site.