Project Description

This project consists of removing and replacing existing traffic signal equipment and providing ADA sidewalk upgrade.

  • New curbs and curb face sidewalk
  • ADA concrete curb ramps
  • Restoration
  • One side of the road will be open to traffic but may be blocked by construction equipment of vehicles for intermittent periods.
  • Drive slowly and cautiously through the job site, especially when the contractor is on site working.
  • It will be muddy or dusty and noisy at times.
  • Do not move barricades or remove caution tape. The contractor will move them and open the road to traffic when it is acceptable to be driven on.

  • PAY ATTENTION

    AVOID DISTRACTIONS!

    Be aware of all signage and reduced speeds. Avoid distractions such as cell phones, eating/drinking, and radio.

  • BARRICADES

    DO NOT MOVE BARRICADES!

    The contractor will move them once pavement passes testing and can withstand vehicle weights.

  • WORKER SAFETY

    BE PREPARED TO STOP!

    Slow down and give workers extra room. Drive cautiously through the jobsite especially If workers are on site.