Project Description

This trail will be constructed in late 2024 with completion in the fall of 2025. The asphalt trail will be 0.76 miles long and will run along the west side of Wheelock Road from Jefferson Middle School to Stellhorn Road and then along the north side of Stellhorn Road heading west past the church. The project will include a pedestrian bridge over the Bullerman Drain. This trail will also connect to the existing Wheelock Road Trail at Jefferson Middle School and the existing Stellhorn Road Trail.

Project Location

Trail Rules

  • No Motor Vehicles

    Trails are designed only for people-powered vehicles.

  • Leash your Pets

    Pets are welcome, but must be leashed. Remove and dispose of any waste.

  • Be Kind

    Be respectful of others. Always yield to slower trail users.

  • Safety First

    Obey all traffic signs and signals.

Mid-Block Crossings

As of February 2024, the Fort Wayne Area Trails Network consists of 142 miles of trails, with 101 miles inside City limits. Most of the trails in City limits are planned, designed, constructed, and maintained by the City of Fort Wayne under the leadership of Mayor Sharon Tucker.